Showing posts with label market. Show all posts
Showing posts with label market. Show all posts

Friday, April 8, 2011

Traffic Alert


Here's a heads up for those coming out to the Craft Fair at Downtown Arlington Farmer's Market tomorrow morning. Traffic on 360 will be a mess around Division so you might want to exit well ahead of that and cut on across to Collins to continue North or South (depending on which direction you are coming from. Until you get to Abrams or Division then head west. The address is 215 E Front Street Arlington, TX 76001.
Traffic Message has been issued by the Arlington Police Department (Texas).

Friday April 8, 2011 11:10 AM CDT

Motorists on SH 360 at Division are encouraged to take alternate routes this weekend; Lane closures, detours planned.
North and southbound State Highway 360 in Arlington at State Highway 180 will have lane closures and detours starting Friday, April 8, at 8 p.m., through Monday, April 11, 5 a.m., weather permitting.

Motorists on north and southbound SH 360 will be reduced to one lane and detoured from the highway at SH 180 for the construction of the railroad bridge spanning SH 360. Motorists are encouraged to seek alternate routes.

During construction, northbound motorists will exit at Abram Street. After exiting, traffic will be directed east along Abram Street to Great Southwest Parkway where motorists will cross the Union Pacific Railroad. Detoured motorists will travel westbound on SH 180/Division Street to return to SH 360.
Southbound traffic will exit at SH 180/Division Street. After exiting, traffic will be directed west along SH 180/Division Street to Stadium Drive where motorists will cross the Union Pacific Railroad. Detoured motorists will travel eastbound on Abram Street to return to SH 360.

The construction is part of the $56 million project that is reconstructing the Division Street bridge and the railroad bridge. Included in the construction is the addition of shoulders on SH 360, improved ramp access at Division Street and new continuous frontage roads under the rail lines. Completion of the project is scheduled for summer 2012.

For up-to-date project information, current road closures and to sign-up for e-mail alerts on construction activity, log on to: www.keep360moving.org.

For full details, go to https://local.nixle.com/alert/4675870/?sub_id=421195.

Contact Information:
Tiara Ellis Richard
Police Media/Office of Communication
817-459-5624 tiara.richard@arlingtontx.gov

Friday, February 25, 2011

Etsy 817 Craft Fair - CALL FOR VENDORS!


Etsy817 will be hosting a craft fair at the Downtown Arlington Farmers Market, Saturday, April 9th.

We are looking for vendors for our craft fair at the market promoted by Etsy817

Where: Downtown Arlington Farmers Market www.downtownarlingtonfarmersmarket.com

When: Saturday, April, 9th 2011
Set-up: 7am

Tear down: 1pm (no early tear downs will be allowed.)

Cost per booth: $15.00

There are limited spaces available a few indoors and a few more outdoors. They are first come first to set up (with the exception of the farmers, they have permanent spaces). We will not hold a space for anyone. Must provide your own table and if you are outside and you would like a canopy you must bring that. Although, they are not required. All vendors must print and fill out a Vendor release form and the application you can find here: http://downtownarlingtonfarmersmarket.com/Vendor-Application.html Please fill these forms out (ignore the farming part lol) and bring them with you along with your $15.00 booth fee.

If you would like to be a vendor, please let Amy DeVoe know A.S.A.P. So that she can make sure you are on the list of approved vendors. etsy817 [!at] gmail.com